Light commercial · Campus
Campus and light commercial backup—without a fake client.
How Digital Electric approaches occupied facilities: shutdown windows, documented loads, and storage when it belongs. This is a method page, not a named case with invented metrics.

Goal
What this job is for.
Keep the circuits operations actually need—IT closet, selected HVAC, lighting, charging, or a process line—through an outage or a planned switching event, with paperwork a facilities team can live with.
Constraints
What usually binds the design.
- Occupied building: shutdown windows, lockout, and drawings that match the field
- Utility interconnection and AHJ path for storage on a commercial service
- Tesla Powerwall is a product we are authorized to install; it is not every commercial solution
- Digital Electric is not a Tesla Solar installer partner yet
Design
How we decide before hardware lands.
- Define the outcome and the loads before anyone orders hardware
- Power systems engineering where studies, protection, or power quality are in play
- Powerwall 2 or 3 only where Tesla’s residential/light-commercial product actually fits
- Fleet or workplace charging as a separate capacity conversation when needed
Install
Field work, then Tesla Home.
Construction sequenced around the facility, then commissioning and closeout. Campus and plant photos on this page are stock, not a named Digital Electric client.

Temporary stock — replace with a Digital Electric job-site photo. Unsplash photo-1607237138185-eedd9c632b0b. 
Temporary stock — replace with a Digital Electric job-site photo. Pexels photo 236705. 
Temporary stock — replace with a Digital Electric job-site photo. Pexels photo 257736.
Outcome
What we will publish when a job is real.
- Placeholder — circuits that stayed up vs the agreed load list
- Placeholder — outage or switching window actually used
- Placeholder — closeout package (as-builts, Tesla registration if Powerwall)